From the hands of our friends at SomosiPhone we get a very interesting little trick to change the order in which the photos appear in our albums of the "Photos" application, which, as you know, iOS orders chronologically.
In this simple way, which is explained in the video below, we can now sort our photos instead of by date, in the order we want, on devices with any version of iOS 5 without jailbreak. We must bear in mind that this trick cannot be used in the albums that iOS creates by default, for this we must move desired images to new or existing albums created by us.
It is possible that this function will be improved in future firms, since for the moment, and even though the one that SomosiPhone shows us is a great trick, we can only move position images in the same album one by one, selecting it and placing it in the chosen place, which is a bit tedious when you want to move several photos in the same album.
https://youtu.be/X66v_ejOAfI
Here only two things are understood, either all of Apple are stupid or some garcas who just want to monopolize everything for obvious reasons of profit without caring about the customer.
Because they couldn't have made a more stupid and complicated design. They take the flag to the most retarded or the most graceful.
There are no doubts that only that is understood and do not tell me that they are geniuses because they have a lot of errors in everything that it would take me a long time to mark them all.
In short, the iPhone looks like a phone for the mentally retarded. I hope they improve it. Luck
Genius! Thanks to your tutorial, I managed to organize the photos in my albums on the Ipad. Very good instructions. Grateful.
Why do we have to become magicians to order as we want? is it so hard for apple to allow us this or is it that they just don't care about us? They work wonders, but this so basic does not.
How can I sort photos from an Album synced with the iPad. He orders them differently than he had them on the computer. What does the iPad take into account when sorting photos?
Hello I am trying to do this on an Ipad 2 and it is not possible. Can someone tell me how to place the photos inside the album on an ipad with OS 5.1.1
If you can't, does anyone know of an app to do it? I need to see the photos in a certain order and with all the quality. Thank you. julengon@hotmail.com
Hello Juanjo, because we have tested it precisely on an iPad 2 with iOS 5.1.1 and it works perfectly. 2 things:
– This trick only works on albums created by you.
– Move the photos to your album, press the icon at the top right of send, and you can move the photos.
To create a new album in the photos app: go to » albums > edit > new album «
Indeed I was testing it with albums that I had created in synchronization with the PC.
If I create a new Album, then I can move the images as you indicate.
Thank you very much.